- Scheduled22 May 2026 · 05:45:00 UTC
On Friday, 22 May 2026, starting at 07:45 AM (CEST), the datacenter will perform maintenance work on the power infrastructure to further improve resilience and ensure uninterrupted power availability in the event of a utility power outage.
Most systems are connected to redundant power feeds and will not be affected. However, a limited number of servers require a restart during this maintenance because they are equipped with a single power supply and therefore cannot be connected to both power feeds simultaneously.
The maintenance window is scheduled for a maximum duration of 30 minutes.
A few minutes before the maintenance begins, we will perform a graceful shutdown of the affected servers and start them again once the work has been completed.
The following dedicated servers are affected:
- s544
- s553
In addition, the following virtualization hosts are affected:
- RYZEN-01-VHOST-EYG1
- RYZEN-03-VHOST-EYG1
- RYZEN-05-VHOST-EYG1
Virtual machines hosted on these nodes will be unavailable for the duration of the maintenance window and will automatically start again once the host systems are back online.
We apologize for any inconvenience this may cause and appreciate your understanding.
- In progress22 May 2026 · 05:45:00 UTC
Maintenance is now in progress